跳到主要內容區塊

長庚大學 工商管理學系

 
 
 

李文義 副教授 / 工商管理系主任

職稱副教授 / 工商管理系主任
信箱
leewe@mail.cgu.edu.tw
電話:03-2118800 # 5407
個人網頁
http://www.sedona.bz/members/wenyihlee/cv/
學歷:美國德州大學奧斯丁校區 企業管理博士
專長領域:作業管理、供應鏈管理

工作經歷
長庚大學 工商管理系系主任 (2018年三月 – 現今)
長庚大學 商管專業學院執行長 (2011年二月 – 2014年七月)
長庚大學 工商管理系EMBA主任 (2007年八月 – 2011年一月)

殊榮:2002:  , Chang Gung University.  Best Student Consultation Award.

學會與專業認證
Alumni newsletters of Chang Gung University, 2009 ~ 2010
2nd International Conference on Operations and Supply Chain Management, 2008

發表期刊論文

  1. Lee, W., Wang, S.-P., and Chen, W.-C. (2017).  Forward and backward stocking policies for a two-level supply chain with consignment stock agreement and stock-dependent demand.   European Journal of Operational Research, 236 (3), 830-840.
  2. Lee, W. & Wang, S.-P. (2016). Integrated supply chain model with stock-dependent and limited vendor warehouse capacity constraint.   2016 International Conference on Healthcare and Management, Taoyuan, Taiwan.
  3. Wang, S. & Lee, W. (2016).  A note on 'A two-level supply chain with consignment stock agreement and stock-dependent demand'.   International Journal of Production Research, 54 (9), 2750-2756.
  4. Wang, S., Wang, S.-P, & Lee, W. (2014).  A case study for reducing client waiting time in a health evaluation center using design for six sigma.   Engineering Management Journal, 27 (2), 62-73.
  5. Wang, S. & Lee, W. (2013).  A joint economic lot-sizing model for the hospital's supplier with capacitated warehouse constraint.   Journal of Industrial and Production Engineering, 30 (3), 202-210.
  6. Lee, W. & Matsuo, H. (2012). Managing production ramp-up in semiconductor manufacturing.   4th World Conference on Production and Operations Management, Amsterdam, Netherlands.
  7. Wang, S.-P., Lee, W., & Chang, C.-Y (2012).  Modeling the consignment inventory for a deteriorating item while the buyer has warehouse capacity constraint.   International Journal of Production Economics, 138, 284-292.
  8. Lee, W. & Wang, S. P. (2011). Managing level of vendor-managed inventory with manufacturer's warehouse capacity constraint.   23rd European Conference on Operations Research, Bonn, Germany.
  9. Lin, S. W., Yu, V. F., Lee, W., & Ting, C. J. (2010).  Solving the Location Routing Problem Based on a Simulated Annealing Heuristic.   Computers and Industrial Engineering, 58, 288-299.
  10. Lee, W. & Wang, S. P. (2009). Lot size decisions in a three-level supply chain with freight rate discounts.   Journal of the Chinese Institute of Industrial Engineers, 26 (3), 165-175.
  11. Lee, W. & Wang, S. P. (2008). Lot size decisions in a three-level supply chain with freight rate discounts.   2nd International Conference of Operations and Supply Chain Management, Taipei, Taiwan.
  12. Lee, W. & Wang, S. P. (2008).  Managing level of consigned inventory with buyer's warehouse capacity constraint.   Production Planning and Control, 19 (7), 677-685.
  13. Wang, S. P., Chang, C., & Lee, W. (2008). Managing level of consigned deteriorating inventory with buyer's warehouse capacity constraint.   ILS 2008, Madison, Wisconsin.
    Lee, W. & Wang, S. P. (2007). Managing joint economic lot size with buyer's warehouse space capacity constrained.   ORSA/TIMS Annual Conference, 2007, Seatle, 
  14. Lee, W. (2005).  A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering.   Omega, 33, 163-174.
  15. Hsu, K. H., Chen, Y. T., Shih, C. P., Lee, W., & Wu, C. C. (2004).  The model for predicting physician productivity in the teaching hospitals.   Sun Yat-Sen Management Review, 9-33.
  16. Wang, F. K. & Lee, W. (2001).  Learning curve analysis in total productive maintenance.   Omega, 29, 491-499.

 

瀏覽數  
  • 友善列印
  • 新增到收藏夾
  • 分享
將此文章推薦給親友
請輸入此驗證碼